Another Rochester Road Project Begins Monday
Rochester, MN (KROC-AM News) - Rochester motorists are being told to be prepared for road work scheduled to begin Monday on another section of West Circle Dr.
This rehab project will affect southbound traffic between Highway 52 and Valleyhigh Road. It will limit traffic to a single lane.
The Olmsted County Public Works Dept. says “motorists should expect delays and seek alternate routes if possible.”
The rehab project on the section of W. Circle Dr. between Country Club Manor and near Apache Mall is still limiting traffic to a single lane.
Meanwhile, a utility project on the south end of the downtown Mayo Clinic campus will affect some public bus routes beginning Monday. The city says routes that previously stopped on 2 Ave SW between 2nd and 3rd streets will move to alternative locations for the next few weeks.
Routes 6D and 15D will stop on 3 St SW just west of 2 Ave SW
Routes 12, 12M, 12N and 14 will stop on 3 Ave SW between 2 St and 3 St SW
Route 19 will stop at the Route 1 stand on 2 St SW between 2 Ave and 3 Ave SW.